| Client |
PNG Electricity Commission, Papua New Guinea |
| Location |
Port Moresby, Papua New Guinea |
| Gross power |
25.6MW |
Diesel Engine (2 units) |
- Supplier : Doosan Engine, Korea
- Model : DOOSAN-MAN B&W
7K60MC-S(Mk5)
- Cylinders : 7
- Bore/Stroke : 600mm/1,650mm
- Revolution speed/frequency :
142.9rpm/50Hz
- Fuel : Heavy Fuel Oil(HFO #6)
|
Cooling System |
- Primary : fresh water
- Secondary : fresh water(Cooling
Tower)
|
Generators( 2 units) |
- Supplier : Alstom
- Cooling System : air-to-water
- Generation voltage : 11kV
- Transmission voltage : 66kV
|
Waste HeatBoiler (2 units) |
- Supplier : Kanglim Giywon Co.,
Ltd., Korea
- Capacity : 1,200kg/h
- Type : horizontal, water tube
- Pressure : 7bar.g
- Temperature : 170℃
|
| Power Plant |
- Area : 35,000mm x 47,000mm
- Height : 17,900mm
- Overhead crane : 90ton/10ton
|
Fuel Tank (2 units) |
- Type : conical
- Capacity : 1,900㎥
|
| Substation |
- Supplier : PMC,USA
- Type : external, single bus
- Voltage : 66kV
|
66kV Trans- mission Line |
- Length : 7.6km
- Type : single line(3-phase, 3-
wire)
- Transmission tower type : steel structure
|
| Contract |
Turn-Key(including transmission equipment & power plant O&M service) |
Commecial startup |
Jan. 1999 |